Manufacturing Since 2005 · Faridabad
Cable Tray Quality and Inspection
Agree the acceptance criteria with the factory team before production.
Pre-dispatch inspection checklist
- Verify base material, grade and sheet thickness against the approved specification.
- Check width, side height, length and applicable perforation or rung spacing.
- Confirm finish, workmanship and any specified coating or edge criteria.
- Check alignment of covers, couplers and matching route fittings.
- Reconcile quantities, identification and packing with the order.
Open the printable technical submittal and blank inspection sheet
SRG International Pvt. Ltd.Call the factory